Gosselin Moving N.V.

Specifications


This rate schedule is valid until May 31, 2010 only for FIDI, HHGFAA, LACMA, AMSA, BAR, FEDEMAC and OMNI members, and replaces all previous rate schedules / agreements. Changes to our rates will only be made available via this website and not by individual notification. Therefore you should always visit our website to obtain the latest version.

The validity of the schedule is always indicated at the bottom of each page.

To avoid any confusion and/or discussions, when you advise us of the forthcoming shipment, refer to the rate and date used. The time between your pre-advise and used rate must not exceed 60 days. In the event that you only book the shipment after the 60 days validity, contact us to see if we can maintain the published rate.

Rates are bases on the following:

  • All rates are in EURO and per 100 lbs net
  • Ex arrival port of Antwerp, EXCLUDING Terminal handling charges, port- and/or reception charges, deconsolidation charges, etc.
  • In case these charges are COD to your client we will add an administrative handling fee of min. 25 EUR.
  • Minimum density for all surface shipments: 6.50 lbs. per cft. gross.
  • Minimum charge for LCL/NVOCC 1000 lbs. net.
  • Minimum weight per consolidation or FCL container: 20' = 4001, 40' = 8001, 40' HC = 10001 lbs net
  • Maximum billing for FCL shipments (if one customer, one address, hhg only): 20' = 6500, 40' = 10000, 40' HC = 13000 lbs net (only valid for a density below 7.5 lbs per cft gross)

 

Services included / excluded in rates

Included

  • linehaul Antwerp port to our depot

  • deconsolidation and transit clearance

  • return of empty container to docks

  • transport & delivery to final destination based on consolidation service

  • normal house delivery, unpacking & setting up

  • based on normal access, maximum 2nd floor

  • removal of debris on day of delivery

  • storage in our warehous for 14 days (only for liftvan packed shipments)

 

 

 

 

Excluded

  • Terminal handling charges, port- and/or reception charges, deconsolidation charges, etc.

  • Customs clearance for hhg ex non EU countries

  • Additional customs clearance for automobiles

  • demurrage / detention charges

  • delivery with abnormal access, long carry, shuttle service or hoisting

  • above 2nd floor delivery, use of exterior elevator

  • parking space reservation

  • delivery of piano, safe or other large and/or bulky items

  • complex furniture assembly

  • import duties / taxes

  • temporary- or non household goods clearance

  • customs inspections and/or scanning charges

  • excessive delays at customs points

  • unexpected increase in road taxes / fees

  • insurance coverage

  • COD shipments (see separate page)

 

Notes:

1. extra floor: (Belgium, France, The Netherlands, Germany and Switzerland)

  • The additional charge for delivery above 2nd floor will be EUR 2,50 per 100 lbs and per floor, based on use of inside elevator and/or staircase if possible without damages to the furniture and/or residence.

2. free storage:

  • The 14 days free storage only applies while waiting for the shipper to provide the necessary import clearance documents.

  • If the shipper cannot take delivery as per our schedule the storage and handling charges will commence as of the day the goods are placed into our warehouse.

  • This does not apply for loose Full Container Loads - either there will be demurrage and/or detention charges or handling in/out charges + storage (see storage in transit page).

3. accessorial services:

  • Accessorial services for which additional charges will apply, as per outlay, will include but will not be limited to:

    • parking space reservation

    • use exterior elevator

    • delivery of piano - safe and/or other large and/or bulky items

    • third party services such as electricians, carpenter, etc. ...

    • COD shipments (see page on COD shipments)

    • ...